Part of peel holdings strategic regeneration...

of Liverpool docks to create the Atlantic Gateway and form a new deep water berth connecting along the Manchester ship canal to Port Salford. A major multimodal berth and distribution facility servicing the greater Manchester area. Phase 1 infrastructure and the first facility comprising of a 350,000 sq ft Regional Distribution Centre for Culina was successfully delivered in April 2016.

The proposed rail and port infrastructure at Port Salford will introduce the first tri-modal facility of its type in the UK.

We have subsequently been instructed to prepare a strategic master plan for 6.5 million sq ft east of Irlam as part of an expanded project.

Culina

Client: Peel Logistics / Culina
Location: Salford